            Foam Kid Fire Fighting Pipe Line-Qatif

            Foam Kid Fire Fighting Pipe Line-Qatif

            • Client
              MultiLines Construction And Technical Services
            • Duration
              3months
            • Location
              Qatif
            • Value
              650,000.00 SR
            • Year Completed
              2010
             
            BULK PLANT-testing and commissioning of gt3 substation electrical equipment’s in hawiay gas plant.
            Includes testing and commissioning of 13.8 kv mv metal glad double-ended switchgears, 4.16 kv mv motor control centers, 480 volts lvmetal clad double-ended switchgears, and power transformer.
             
            gaz plan